Gujarat · Jamnagar

Job tracking for Jamnagar's brass & metal units.

See every job from cutting to dispatch, with traceability and quality, built for Jamnagar's brass-parts and metal-components cluster. Live in 4-6 weeks, alongside your Tally.

Built for Jamnagar's manufacturers, live data, not end-of-day Excel.
TaktProductionLive
Jobs on time
92%
WIP jobs
48
Due today
6
Jobs by work-centre
Live in 4-6 weeks· Works alongside Tally / your ERP· 30+ years manufacturing-tech experience· Configured to your process
The problem

Running brass at Jamnagar volumes? You can't count what you can't see.

Lakhs of small components move through cutting, machining, plating and job-work every week. On paper it looks fine. On the floor, nobody knows the true status until dispatch day.

Batches blur together

Thousands of near-identical brass parts flow in mixed lots. One traceability question and the search takes hours across registers and memory.

Job-work is a blind spot

Half your work sits with sub-contractors for plating, machining or forging. You hear status by phone, not from a system.

Export rejections cost double

A consistency slip caught at the buyer's end means re-work, freight losses and a hard conversation. You need the defect caught here, not there.

How it works

From first look to live floor in 4-6 weeks

No rip-and-replace, no year-long project. We fit the system to how you already run.

1

We study your floor

We map how your shop actually runs jobs, cutting, work-centres, QC and dispatch.

2

We configure to match

TaktProduction is configured to your job flow and work-centres, alongside your existing accounting.

3

Go live in 4-6 weeks

Every role is trained and you go live, with support that stays after launch.

What you'll see

A live board for every job

TaktProduction gives you one live view of every brass job, every lot and every sub-contractor, from raw rod to boxed export order.

Live job status by stage

See exactly where every job is, from cutting to finishing to dispatch.

WIP by work-centre

Know what each work-centre is loaded with and where the bottleneck is.

Material traceability

Heat / lot to finished part, answer any traceability query in seconds.

Quality checks at each stage

QC moves upstream, so defects are caught early, not at dispatch.

Dispatch readiness

See what's ready to ship and what's at risk of slipping.

Automated job & delay reports

Status and delays reported automatically, no clipboards.

Traceability without paperwork

Lot traceability built for high-volume small parts

Tie every finished component back to its heat and lot number, across every stage and every job-worker. When a buyer or auditor asks where a batch came from, you answer traceability queries in seconds, not by digging through paper.

  • Heat and lot linked to finished part, even across mixed high-volume runs
  • Live status for jobs sitting with plating and machining sub-contractors
  • Stage-wise QC checks so defects surface before parts ship, not after
  • Runs on tablets and mobile on the shop floor, alongside your Tally
Job board, liveLive
Jobs on time
92%
WIP jobs
48
Due today
6
Jobs by work-centre
Built for Jamnagar

Made for Jamnagar's manufacturers

Jamnagar's brass-parts cluster runs huge volumes of small components to export standards, where traceability and consistency decide repeat orders.

  • Built for brass and metal-component units
  • Implementation and support in the region
  • Works with your existing Tally / accounting
  • Gujarati / Hindi support for your floor teams
Outcomes

What changes after go-live

4-6 weeks
Live and configured to your job flow
Seconds
To answer a lot-traceability query
30+ years
In manufacturing technology (Omega CST)
For high-volume brass, the win is knowing exactly which lot a part came from and where a job is sitting, without chasing anyone.
Production Head, precision brass components
Illustrative, replace with a named customer reference before publishing.
Fits how you already work

You don't have to rip anything out

TaktProduction runs alongside the systems you already depend on. It handles the shop floor; your accounting stays exactly where it is.

  • Runs alongside your existing accounting
  • Configured to your job flow and work-centres
  • No long ERP project, live in 4-6 weeks
  • Role-by-role training and post-launch support
FAQ

Straight answers

Can it trace a single component back to its heat and lot number?
Yes. Every part stays linked to its heat and lot through each stage, right to dispatch. When a buyer queries a batch, you answer traceability queries in seconds instead of searching registers.
We make lakhs of small parts a week. Can it handle that volume?
Yes. Status is tracked by job and lot, not by hand-counting each piece. You get live WIP by work-centre and stage, so high volumes stay visible without extra paperwork.
A lot of our work goes to sub-contractors. Do we lose visibility?
No. Job-work sent out for plating, machining or forging shows live status in the same system. You see what is out, what is due back and what is delayed, without phone rounds.
How does it help us keep export batches consistent?
QC checks run at each stage, so a defect is flagged before the batch ships. Consistent lots reach the buyer and rejections and re-freight drop.
Do we have to drop our current accounting system?
No. TaktProduction runs alongside Tally or your existing ERP. It handles live production; your accounts stay where they are. Live in 4-6 weeks.

See every brass lot, from rod to export carton.

Book a walkthrough built around Jamnagar job-work and volumes. We configure it to your flow and go live in 4-6 weeks, alongside your Tally.

Client success story

A premium UAE manufacturer took real-time control of its floor

Manufacturing · UAE

The challenge

A premium UAE gift manufacturer working across several material types was losing time to communication gaps and delays, with no real-time view of job progress or quality control across departments.

The solution

TaktProduction gave them a live production dashboard. Job orders are raised in full detail, each department gets alerted and tracks its tasks in real time and cross-department steps enforce quality checks as work moves along. Management can watch progress from order to dispatch. We later added easier task editing, multi-image support and cleaner handovers.

The result

  • Faster cross-team communication
  • Fewer production delays
  • Real-time quality visibility
  • Oversight for faster management decisions

Management gained the oversight it needed for faster decisions and stronger quality control across every department.