Gujarat · Rajkot

Job tracking for Rajkot's engineering & fabrication shops.

See every job from cutting to dispatch, with traceability and quality, built for Rajkot's casting, engineering and metal-fabrication units. Live in 4-6 weeks, alongside your Tally.

Built for Rajkot / Gujarat's manufacturers, live data, not end-of-day Excel.
TaktProductionLive
Jobs on time
92%
WIP jobs
48
Due today
6
Jobs by work-centre
Live in 4-6 weeks· Works alongside Tally / your ERP· 30+ years manufacturing-tech experience· Configured to your process
The problem

Your castings ship worldwide. Your job status lives on a whiteboard.

Rajkot runs on castings, CNC work and engineering job-work. But when an export buyer calls for a status, the answer is a walk to the shop floor and a few phone calls.

Export deadlines leave no slack

When a buyer abroad asks where their order stands, you chase supervisors by phone instead of reading it off one screen.

Castings stall between stages

Parts move from foundry to CNC to finishing. Between those stages jobs sit idle and nobody notices until dispatch slips.

Job-work parts vanish

Half your work goes out to job-work vendors. Parts disappear into their sheds and come back late, often with no paperwork.

How it works

From first look to live floor in 4-6 weeks

No rip-and-replace, no year-long project. We fit the system to how you already run.

1

We study your floor

We map how your shop actually runs jobs, cutting, work-centres, QC and dispatch.

2

We configure to match

TaktProduction is configured to your job flow and work-centres, alongside your existing accounting.

3

Go live in 4-6 weeks

Every role is trained and you go live, with support that stays after launch.

What you'll see

A live board for every job

TaktProduction puts every Rajkot job on one live screen, from casting to CNC to dispatch.

Live job status by stage

See exactly where every job is, from cutting to finishing to dispatch.

WIP by work-centre

Know what each work-centre is loaded with and where the bottleneck is.

Material traceability

Heat / lot to finished part, answer any traceability query in seconds.

Quality checks at each stage

QC moves upstream, so defects are caught early, not at dispatch.

Dispatch readiness

See what's ready to ship and what's at risk of slipping.

Automated job & delay reports

Status and delays reported automatically, no clipboards.

Traceability without paperwork

Traceability your export buyers actually trust

Foreign customers and auditors want to know which heat, which lot and which QC check made their part. Tie heat and lot numbers to each finished part and answer traceability queries in seconds.

  • Heat and lot number linked to every finished part
  • QC check recorded at each stage, not after dispatch
  • Job-work parts tracked while they sit at outside vendors
  • Automated delay reports before the shipment date slips
Job board, liveLive
Jobs on time
92%
WIP jobs
48
Due today
6
Jobs by work-centre
Built for Rajkot / Gujarat

Made for Rajkot / Gujarat's manufacturers

Rajkot's engineering and casting cluster runs on job work and tight margins, where a slipped job or a traceability query costs real money.

  • Built for casting, engineering and fabrication shops
  • Implementation and support in the region
  • Works with your existing Tally / accounting
  • Gujarati / Hindi support for your floor teams
Outcomes

What changes after go-live

4-6 wks
From kickoff to live
30+ yrs
Manufacturing-tech experience
Seconds
To answer a traceability query
If a buyer in Germany asks which heat their casting came from, I want the answer on my phone, not next week.
A question we hear from Rajkot export job-shops
Illustrative, replace with a named customer reference before publishing.
Fits how you already work

You don't have to rip anything out

TaktProduction runs alongside the systems you already depend on. It handles the shop floor; your accounting stays exactly where it is.

  • Runs alongside your existing accounting
  • Configured to your job flow and work-centres
  • No long ERP project, live in 4-6 weeks
  • Role-by-role training and post-launch support
FAQ

Straight answers

Do we have to drop our Tally setup?
No. TaktProduction runs alongside Tally and your accounting. It handles live production tracking on the shop floor while Tally keeps doing your books. Nothing gets replaced.
How long before it is running on our floor?
Live in 4-6 weeks. We configure it to your real job flow, from casting to CNC to dispatch, then train each role and support you after launch.
Can it handle export customer audits?
Yes. Heat and lot numbers stay linked from raw material to finished part, with QC checks logged at each stage. When an auditor or buyer asks, you answer traceability queries in seconds.
We send a lot out to job-work vendors. Does that break the tracking?
No. Sub-contracted parts stay on the same live system while they sit outside. You see what left, what came back and what is overdue at each vendor.
Will our floor staff actually use it?
It runs on tablets and mobiles on the shop floor with simple stage updates. Training is role by role, so operators, supervisors and QC each learn only their part.

Answer your export buyers before they chase you

See TaktProduction set up around your own casting and CNC flow. Live in 4-6 weeks, running alongside Tally, with role-by-role training and support after launch.

Client success story

A premium UAE manufacturer took real-time control of its floor

Manufacturing · UAE

The challenge

A premium UAE gift manufacturer working across several material types was losing time to communication gaps and delays, with no real-time view of job progress or quality control across departments.

The solution

TaktProduction gave them a live production dashboard. Job orders are raised in full detail, each department gets alerted and tracks its tasks in real time and cross-department steps enforce quality checks as work moves along. Management can watch progress from order to dispatch. We later added easier task editing, multi-image support and cleaner handovers.

The result

  • Faster cross-team communication
  • Fewer production delays
  • Real-time quality visibility
  • Oversight for faster management decisions

Management gained the oversight it needed for faster decisions and stronger quality control across every department.