Maharashtra · Pune

Production tracking for Pune's manufacturers.

Real-time visibility from order to dispatch for Pune and Maharashtra's FMCG, engineering and auto-ancillary units. Live in 4-6 weeks, alongside your Tally.

Built for Pune / Maharashtra's manufacturers, live data, not end-of-day Excel.
TaktProductionLive
On-time
94%
OEE
78%
At risk
2
Output by line, last 8 hrs
Live in 4-6 weeks· Works alongside Tally / your ERP· 30+ years manufacturing-tech experience· Configured to your process
The problem

Your Chakan and Bhosari lines run fast. Your data doesn't keep up.

By the time the shift report reaches you, the shift is over. On Pune's high-volume FMCG lines, you hear about a stoppage after it has already cost you output.

Paperwork lags the line

Operators log output on paper. You see numbers next morning. A jam at 2pm surfaces at 9am, too late to fix.

Downtime with no reason

Lines stop across Ranjangaon MIDC and nobody records why. Without ranked downtime reasons, the same loss repeats every single week.

Guessing dispatch readiness

Sales promises delivery; the floor isn't sure what's packed. WIP and material status live in people's heads, not one screen.

How it works

From first look to live floor in 4-6 weeks

No rip-and-replace, no year-long project. We fit the system to how you already run.

1

We study your floor

We walk your lines, map how you actually run batches, changeovers and packaging, not a textbook process.

2

We configure to match

TaktProduction is set up to match your lines, shifts and products and connected alongside your accounting.

3

Go live in 4-6 weeks

Your team is trained role-by-role and you go live, with support that stays after launch.

What you'll see

One screen for the whole line

TaktProduction puts your line on one live screen, output, OEE, downtime and dispatch, built around how your Pune plant actually runs.

Live output per line

See what each line is producing right now against target.

Downtime & top stop reasons

Every stoppage captured and ranked, so you fix the biggest losses first.

OEE, automatically

Availability, performance and quality, measured, not estimated.

WIP & material status

Know what's in progress and whether material will run short.

Dispatch readiness

See which orders are ready to ship and which are at risk.

Automated shift reports

No more manual reconciliation, the report writes itself.

OEE, done right

OEE your supervisors will actually read

Availability, performance and quality, tracked in real-time on tablets right at the line. Marathi and Hindi floor teams tap a reason when a line stops, no typing, no forms. You get ranked downtime and automated shift reports without chasing anyone.

  • Live line output on tablets at Chakan speed
  • Downtime reasons ranked, not buried in a register
  • Automated shift reports, no manual compiling
  • Runs alongside your Tally, nothing to rip out
OEE, Line 3Live
On-time
94%
OEE
78%
At risk
2
Output by line, last 8 hrs
Built for Pune / Maharashtra

Made for Pune / Maharashtra's manufacturers

From Chakan and Bhosari to Ranjangaon and Waluj, Maharashtra's manufacturers run some of India's busiest lines, too busy to run on Excel and WhatsApp.

  • Built for FMCG, engineering and auto-ancillary plants
  • Implementation and support in the region
  • Works with your existing Tally / accounting
  • Marathi / Hindi support for your floor teams
Outcomes

What changes after go-live

4-6 weeks
from kickoff to live line
~90%
less manual data entry
30+ years
manufacturing-tech experience
We stopped arguing about last shift's numbers. The screen shows what ran, what stopped and why and everyone sees the same thing.
Production Head, packaged foods unit
Illustrative, replace with a named customer reference before publishing.
Fits how you already work

You don't have to rip anything out

TaktProduction runs alongside the systems you already depend on. It handles the shop floor; your accounting stays exactly where it is.

  • Keeps your Tally / accounting exactly as-is
  • Configured to your lines, shifts and products
  • No long ERP project, live in 4-6 weeks
  • Role-by-role training and post-launch support
FAQ

Straight answers

Do we have to replace our Tally setup?
No. TaktProduction runs alongside Tally and your existing ERP. It handles live production tracking on the floor; Tally keeps doing your accounting. Nothing gets ripped out or migrated.
How long before it's live on our Chakan line?
Typically 4-6 weeks. We configure the system to your actual process, connect your lines and train each role before go-live, so you start with real data, not a blank setup.
Can operators use it if they read mainly Marathi or Hindi?
Yes. The shop-floor screens run on tablets with simple taps to log output and downtime reasons. Training is done role by role, so operators use it without typing long entries.
What if the internet drops on the floor?
You choose cloud or on-premise. On-premise keeps everything running inside your plant network, so line tracking continues even if the internet is down. We set up whichever fits your site.
How is this different from the ERP we already have?
ERP records transactions after the fact. TaktProduction shows the line in real-time, output, OEE and stoppages as they happen, so you act during the shift, not after it closes.

See your Pune floor the way you see your P&L.

Book a walkthrough. We'll map it to one Chakan, Bhosari or Ranjangaon line and show you live output, OEE and dispatch readiness, live in 4-6 weeks, running alongside your Tally.

Client success story

A premium UAE manufacturer took real-time control of its floor

Manufacturing · UAE

The challenge

A premium UAE gift manufacturer working across several material types was losing time to communication gaps and delays, with no real-time view of job progress or quality control across departments.

The solution

TaktProduction gave them a live production dashboard. Job orders are raised in full detail, each department gets alerted and tracks its tasks in real time and cross-department steps enforce quality checks as work moves along. Management can watch progress from order to dispatch. We later added easier task editing, multi-image support and cleaner handovers.

The result

  • Faster cross-team communication
  • Fewer production delays
  • Real-time quality visibility
  • Oversight for faster management decisions

Management gained the oversight it needed for faster decisions and stronger quality control across every department.